Start where the work repeats, then move on site
Construction is short of skilled hands, and much of the work is moving, staging and repeating. The most reliable starting point is the controlled environment of prefabrication, with site work added step by step.
- Robots we supply
- Half-body humanoids for prefab plants
- Collaborative arms for prefabrication
- Quadrupeds for site scanning
- Full humanoids, in pilot
- Industry status
- Early deployments, starting in prefabrication
- How it runs
- Supervised autonomy: the robot performs defined tasks, your team handles exceptions.
- First step
- One prefabrication line or one site-logistics route.
- What you measure
- Material moved per shift
- Crew waiting time
- Deviations found early
- Safety incidents
What the robot does
- 01Material handling in prefab plantsMoves and stages panels, frames and components.
- 02Kitting for assembly crewsPrepares the parts and fixings each crew needs next.
- 03Tool and material deliveryCarries tools and supplies across the site to the crew.
- 04Site scanning and progress recordsWalks the site and documents progress against the plan.
- 05Repetitive marking and drilling supportAssists with layout and repeated fixing tasks under supervision.
- 06After-hours safety roundsChecks the site for hazards when the crew is gone.
What we localize at the hub
- National building codes and site safety law
- Local materials and building methods
- Connection to your BIM and project systems
- Climate and terrain of the region
Regulatory frameworks we work within
- National building codes
- Construction-site safety law of each country
- EU Machinery Regulation 2023/1230
- Site-specific risk assessment to ISO 12100
